I had to stop at the end of the first task

I had 3 painting tasks tied up for this week plus I method to complete them all before Friday. I was going to go fishing with a couple of the guys. All of us were going to rent a boat from the marina plus stay out all afternoon.I did not think what the weather was going to be like when I tied up all of the painting tasks. It turned out to be a honestly sizzling plus humid week. There are a couple of reasons why it takes longer to paint when the temperatures are sizzling plus humid. One reason is due to the humidity. It simply takes longer for the paint to dry when it is humid outside. Another reason why the temperatures are crucial is due to the amount of labor that it takes to paint a house. It is honestly painstaking work. The higher the temperatures, the harder I have to work. It was 105 degrees on Sunday plus I barely made it through the end of the afternoon. It was 105 degrees on Wednesday as well, so I stopped at breakfast time plus did not return to the outdoor painting task. I sat at current home in front of the AC instead. I didn’t even bother to go to the painting task on Friday when the temperature was supposed to be 111 degrees. I stayed current home plus sat in front of the air conditioner on that afternoon too. The temperatures finally returned to a normal plus 90° on Wednesday, however I was already two afternoons behind on our labor by then. I had to cancel the plans I made with our friends so I could finish both of the tasks on Friday plus Friday.

 

Air conditioner installation